Lab 4 · Week 4
Data Visualization: What Each Chart Type Claims
A chart type is not a style choice. Each one answers a different kind of question, and picking the wrong one either hides your finding or invents one that is not there. Today you build four charts from Cascadia's 2025 sales, one of each type, and learn what each is for.
Wanna go analog?or save it as a PDF; the navigation drops out
AI use is not allowed in these four labs. That means no formula help, no error explanations, and no AI checking your work. An AI tool can produce accurate responses to this lab in seconds, which is exactly why it is not allowed: the AI's work never becomes your own.
These four labs build your Excel skills, which are critical in business settings. So, even though it is tedious, this means typing every formula yourself. The goal is to be able to write a formula like =SUM without thinking. If you get stuck, that is what the walkthrough steps, the hints, and your lab professor are for.
AI comes back in Lab 6, where you will use it as a coach under the three lights from Lab 1.
Open cascadia-sales-2025.xlsx, then File
→ Save As and name it LAB4_Last_First.xlsx, the same habit as the last
two weeks. The data is on the Sales2025 tab; checkpoint answers go on the
Analyst tab, in column B on the row matching each checkpoint number. Everything today
is built from pivot tables, so this is also good pivot practice before Exam 1.
Each checkpoint sits directly under the work that produces it. You do the actual work in your own file, then paste the answer here. Get it right and the next question opens up. There is no penalty for a wrong answer, so guess, check, and lean on the hint if you get stuck.
Once you have cleared them all, write your reflection and download your certificate for Canvas. Your progress saves automatically in this browser, so you can close the tab and pick up where you left off. It does not follow you to a different computer or a private window, and clearing your browser data clears it. If you need to start this lab over, use the button.
Part 1What each chart type is for
Four chart types cover most business needs. Each one answers a different question. Read these now; you will build one of each chart type in Part 2.
Bar chart: comparing separate things
Use a bar chart to compare one number across categories that have no natural order, like stores, products, suppliers or regions.
The length of the bar is the number. Bar charts generally follow two rules:
- The axis must start at zero. A bar starting anywhere else draws a difference while your eye reads a size.
- Bar charts should be sorted by value. Since the order of the categories means nothing, an unsorted bar chart makes the reader do the ranking in their head.
Line chart: show change over time
Use a line chart when the horizontal axis is time. The line connects each point to the next, and that connection says something specific: these points follow one another, and the space between them is real. January really is followed by February, so the slope between them means a rate of change.
That is also the limit. Put eight stores on a line chart and it will still slope, but the slope means nothing, because the stores could have been typed in any order. Time is what earns the line.
Scatter plot: showing a relationship between two measures
Use a scatter when you have two numbers measured on the same things and you want to know whether one tells you anything about the other. Does a higher price mean fewer units sold? Each dot is one product, placed by its price and by its sales.
The scatter plot is the only chart type we'll discuss that answers a question about a relationship. Bar, line and pie all reference one number per category, but a relationship requires two variables.
Pie chart: showing parts of one whole
Use a pie when your categories are slices of a single total. Every sale happened in exactly one region, and the four regions together are the whole company, so a pie works.
Keep your pie chart to about five or six slices. People read angles poorly, and every slice you add makes it worse. With more categories than that, a sorted bar chart says the same thing and is much easier to read.
Comparing a number across separate categories is a bar. A number changing over time is a line. Two numbers measured on the same things is a scatter. Parts of one whole, and only a few, is a pie.
Part 2Build all four
From: General Manager · Subject: Four charts for the board packet
"The newsletter numbers landed well, so here is the next ask. The board packet needs four charts from the year. I want to see the stores compared, the year over time, whether our cheap products are really the ones moving, and how the regions split the revenue. Four different questions, so I assume four different kinds of chart. Build them clean enough that nobody squints."
Her four requests are, in order, a comparison, a change over time, a relationship, and a set of parts. That is one of each chart type from Part 1, which is not a coincidence. The first chart we build together; the other three are yours.
Follow along: the comparison, as a sorted bar
Click the Sales2025 tab, then click any single cell inside the data. Insert →
PivotTable, and accept the default of a new worksheet. The how-to box below has every click if this is
your first pivot. In the field list, drag store into Rows and
revenue into Values. You now have eight rows and one number each, which is
exactly the shape a bar chart wants.
How to make a pivot table
- Click any single cell inside the data.
- Insert tab, then PivotTable. (Mac users may see the same menu, but the button may read Summarize with PivotTable.)
- Excel guesses the data range. Check that it covers all the rows, then choose New Worksheet and click OK.
- A panel appears on the right with your column names. Drag a field into Rows to group by it, and drag a number into Values to total it.
- If Values shows a count instead of a sum, click it, choose Value Field Settings, and pick Sum.
If your pivot is empty: you probably selected a single cell outside the data before inserting. Undo and click inside the table first.
Click any cell inside the pivot, then Insert → Recommended Charts → Bar (or Column). A chart appears, wired to the pivot: change the pivot later and the chart follows.
Right-click any revenue value inside the pivot → Sort → Largest to Smallest. Watch the chart reorder itself.
Store names have no natural order, so sorting them will help the chart be easily readable. This would not work with a line chart of months without wrecking it. This is the difference between the chart types discussed in Part 1.
The pivot shows raw values like 148471.75. Right-click any revenue value → Number Format → Number, set Decimal places to 0, and tick Use 1000 Separator.
Every value in the field reformats at once, because we formatted the field and not one single cell. Note what did not happen: the underlying numbers did not change. Formatting controls what a reader sees, which is half of this lab's subject.
The GM asked for a comparison, and a comparison needs a reference point. Which stores are below the average? You could read it off the chart and color those bars by hand, and then recolor them by hand every time the numbers change. Or you can use the IF from Labs 2 and 3 and let the chart apply the rule itself.
- Copy your pivot's store names and revenues, click a blank area, and paste them as values: right-click → Paste Special → Values. Put stores in column A (A2 to A9) and revenue in column B (B2 to B9). A chart cannot take a second series from inside a pivot, so this copy is the chart's data from now on. Pasted values are a snapshot: if the pivot changes later, this copy does not.
- In
C1type the headerbelow average. InC2type=IF(B2<AVERAGE($B$2:$B$9),B2,NA())and fill it down to C9. - Read column C. Where a store is below the average, C repeats its revenue. Where it is not, C shows
#N/A, which Excel refuses to plot. That is the trick: the IF asks the chart only to display the bars you want highlighted. - Select A1:C9 and insert a clustered bar chart. Two series appear. Right-click the second series, Format Data Series, set Series Overlap to 100%, and change its color to red. The below-average stores are now marked, and if a number changes, the marks move by themselves.
What the formula is doing: the test compares each store to
AVERAGE($B$2:$B$9); the dollar signs pin that range so it does not move
when you use the fill handle. If true, write the revenue; if false, write NA(), a
deliberate blank the chart skips. Three parts, same as every IF you have written. Count the
highlighted bars.
Click the vertical axis. It starts at zero, which is where a bar chart's axis has to stay, because bar length is the number. That rule is easy to forget, so spend one minute finding out what it is actually protecting you from.
Right-click the vertical axis → Format Axis, and set the Minimum to
80000. Watch what happens to your eight bars:
- Bellevue now towers over Bellingham, better than four times the height.
- Spokane, Eugene and Boise disappear completely. Their revenue did not change; it is simply all below the floor you just set, so there is nothing left to draw.
Now get the real number. In any empty cell, compute the gap between Bellevue and Bellingham with
=(Bellevue-Bellingham)/Bellingham*100, using the two values from your pivot.
Compare that percentage to what the picture just implied.
Set the minimum back to zero before you go on. The bars will look almost equal again, and that is the honest picture: these five stores really are close, and three more exist.
Then click the chart title and replace it with a sentence that states the finding rather than the topic: "Seattle Flagship leads; the gap to last place is wide," not "Revenue by Store."
Now you: the sequence, as a line
Build a second pivot the same way. This time drag month into Rows and
revenue into Values. The month column holds the month
number, 1 for January through 12 for December,
so the months line up in calendar order on their own. Insert → Recommended
Charts → Line.
Do not sort this one by value. A line chart says the horizontal axis runs in order. Sorting months by revenue would put October next to January and draw a slope between them that means nothing. This is the one chart in the lab where the order is not yours to change.
Read the chart. Revenue falls sharply after the first month, and if you stopped there you would report a collapse. Look at the whole year before you do, and answer both checkpoints below. This is a seasonal business, and the strong months come back.
Now you: the relationship, as a scatter
This chart needs a pivot with two numbers per row, which is new. Build a third pivot with
product in Rows. Drag quantity into Values, then
drag unit_price into Values as well, so the pivot has two value columns.
The second column will say "Sum of unit_price," which is meaningless, since adding up prices tells you nothing. Click it → Value Field Settings → Average. Now each row is one product, with the total units it sold and its average price. That is thirty-five things measured twice, which is exactly what a scatter plot needs.
Excel will not build a scatter plot from a pivot table, so this chart needs the same move as Step 5. Copy the pivot's two number columns, click a blank area, and paste them as values: right-click → Paste Special → Values. Select the two pasted columns, then Insert → Scatter (the first option, markers only, no lines connecting them; a scatter has no sequence to connect). Put quantity on the horizontal axis and average price on the vertical.
What you are looking at: the cloud slopes down to the right. Cheap products sell in volume and expensive ones do not, which every retailer believes and this chart lets you check. No bar chart could show you this, because a bar chart holds one number per product and a relationship needs two.
Now you: the parts, as a pie
Build a fourth pivot table with region in Rows and
revenue in Values. Insert → Pie.
Four regions, every sale in exactly one of them, and together they are the whole company. That is what a pie needs, and it is why this is the only pie in the lab.
To read a share rather than a dollar amount, right-click the pivot's revenue field → Show Values As → % of Grand Total. The pie does not change shape, because it was always showing shares. What changes is that you can now name the number instead of estimating the angle, which tells you something about how much work the picture was doing on its own.
Part 3Reading a chart critically
Building charts and judging them are different skills, and you will spend more of your career doing the second. Somebody sends you a presentation, and you have thirty seconds to decide whether to believe it. These are the three questions to ask, and you can test all three on charts you have already built.
Question 1: Does the chart type match the question?
Go back to your first pivot, the one with stores in Rows, and change its chart type to Line. The line slopes downward and looks like a decline. Nothing is declining: you are looking at eight separate places, drawn as though each one led to the next.
Now sort that pivot alphabetically instead of by revenue. Same numbers, same chart type, and the shape changes completely. If reordering the categories changes the shape, the shape was never a finding. Your bar chart passed this test without you noticing, because reordering bars only reorders bars. The line failed it.
Question 2: Where does the axis start?
You already ran this one in Step 6. Lifting the floor to $80,000 made Bellevue look four times Bellingham and erased three stores entirely, while the real gap was about eight percent. On any bar chart somebody hands you, find the bottom of the axis before you look at the bars.
Question 3: Can you actually read it?
Build one more pie, this time with product in Rows and
revenue in Values. All thirty-five products, one slice each.
Now try to answer a simple question from it: which product is fourth largest? You cannot, and neither can anyone you show it to. Every number in the chart is correct and the chart is still useless, which is its own kind of failure and an easy one to miss, because nothing about it looks wrong. A chart that cannot be read is not a neutral choice. It spends the reader's attention and returns nothing.
Compare it to your region pie, which has four slices and answers its question at a glance. Same chart type, same data, different number of categories.
Keep the line chart of stores and the thirty-five-slice pie in your workbook. Beside them, write two sentences: what the line chart claimed about the eight stores that was not true, and what question the pie chart cannot answer. Naming the mechanism is the skill. "It looked wrong" is not a diagnosis; "a line chart says these points follow one another, and stores do not" is.
FinishReflection & certificate
Same rule as the rest of this lab. Write the reflection below yourself. Do not ask an AI tool to write it, rewrite it, or clean it up.
This is the one part of the lab that shows your lab professor how you think. Rough is fine and typos are fine. It just has to be yours.
One last thing before your certificate
Every chart you built today used accurate numbers, and in Step 6 you saw one axis setting change what those numbers appeared to say. In the field you plan to enter, describe a situation where someone would have an incentive to present true numbers in a shape that leads to the wrong conclusion. What would you check first to catch it?
Fifty words is the minimum, but do not write to the counter. This prints as page 2 of your certificate, so it is the part your lab professor actually reads. Answer it like someone asked you the question out loud.
0 words
All checkpoints cleared
Put your name in exactly as it appears in Canvas, then download your certificate. The code on it is generated from your name, so it is yours and nobody else's.
CanvasWhat to submit
Go to the Lab 4 assignment in Canvas and upload two files.
File 1: your workbook, saved as
LAB4_Last_First.xlsx. It should contain your four charts from Part 2, one of each type, and the sentence from Part 3 explaining what the line chart of stores claimed and why that claim was false. Your checkpoint answers go on the Analyst tab, one per numbered row in column B.
File 2: your completion certificate PDF. Clear all the checkpoints above, write your reflection, and click Download certificate. Your reflection prints as page 2, so you do not submit it separately.