Reference
Glossary
Every term the book defines, A to Z. Each one links back to the chapter that teaches it, because a definition on its own is the flattest way to learn anything in this course.
Wanna go analog?or save it as a PDF; the navigation drops out
A · B · C · D · E · F · G · H · I · J · K · L · M · N · O · P · Q · R · S · T · U · V · W
A
- Acceptance criteria
- Specific, checkable conditions that decide whether a requirement is finished. A requirement nobody can test is not a requirement. Ch 5 →
- Accessibility
- Design that works for people with disabilities; usability's widest circle. Ch 11 →
- Accountability
- The obligation to answer for the outcome; cannot be shared away. Ch 10 →
- Agile / sprint
- Short cycles each ending in working software; a product owner re-ranks priorities as learning arrives. Ch 5 →
- AI agent
- Software given a goal rather than a script; plans and executes steps across systems. Requires a mapped, measured process to be trusted. Ch 4 →
- AI governance
- The accountability structure for models: inventory, audits, documentation, oversight rules, and a named owner with kill authority. Ch 12 →
- Analytics
- Asking recorded facts questions; what databases are for. Ch 7 →
- Artificial intelligence
- Computers doing tasks that seem to require intelligence; today, mostly via machine learning. Ch 12 →
- As-is / to-be map
- Documentation of the process as it currently runs, and as redesigned. Ch 4 →
- Audit
- An independent check that controls exist and are followed. Ch 10 →
B
- Barrier to entry
- An upfront requirement, often a system, that keeps newcomers out. Ch 3 →
- Bias audit
- Testing whether a model's outcomes differ across groups; annual and independent by law for NYC hiring tools. Ch 12 →
- Bottleneck
- The constraint that sets the pace of the entire process. Ch 4 →
- Build vs. buy vs. subscribe
- Own your differentiator; rent your commodities. Ch 11 →
- Bullwhip effect
- Small demand-signal errors amplifying upstream as each layer adds safety margin. Ch 8 →
- Business analyst
- The person who gathers requirements and specifies what a system must do, working between the people who need it and the people who will build it. Ch 5 →
- Business continuity planning
- Preparing to keep operating when a critical dependency fails. Ch 9 →
- Business intelligence (BI)
- Systems and practices that turn organizational data into decision-ready information. Ch 6 →
- Business process
- Structured activities converting inputs into an output a customer values. Ch 4 →
- Business process redesign
- Rethinking a process end to end rather than optimizing steps in place. Ch 4 →
- Business process reengineering
- Redesigning a process from zero around the outcome, rather than tuning its current shape. Ch 4 →
- By-product data
- Data generated as a side effect of ordinary activity, often more valuable than the activity itself. Ch 2 →
C
- Capex vs. opex
- Buying capacity years ahead versus paying for use as it happens. Ch 13 →
- Change management
- The people side of implementation: training, adoption, and trust. The line item that gets cut first and billed last. Ch 8 →
- Change request
- A new or altered requirement arriving after the baseline is agreed, priced in time and money, and approved or refused by someone accountable. Ch 5 →
- Chaos engineering
- Breaking your own systems on purpose so failure is designed for before it is suffered. Ch 13 →
- CISO
- The executive who owns security and answers to the board, increasingly in business terms. Ch 9 →
- Cloud computing
- Other people's data centers, rented over the network, usually by the hour. Ch 13 →
- Collaborative filtering
- Predicting what you will want from patterns across everyone's past behavior; the recommendation engine's core. Ch 12 →
- Commoditization
- The process by which a once-special technology becomes cheap, ubiquitous, and strategically neutral. Ch 3 →
- Competitive advantage
- Creating more value than rivals through differentiation, cost, or speed. Ch 3 →
- Compliance
- Meeting a standard's requirements; a floor, not proof of security. Ch 10 →
- Concentration risk
- Danger from too much depending on a single vendor, system, or point. Ch 9 →
- Concentration risk
- Chapter 9's word, computing edition: too much of the internet on one landlord's floor. Ch 13 →
- Confidentiality / integrity / availability
- The three properties security protects; ransomware attacks availability first. Ch 9 →
- Configuration versus customization
- Setting the vendor's switches vs. rewriting the vendor's software. The second compounds forever. Ch 8 →
- Connectedness
- Linking a fact to other facts until it means something; what moves data up to information. Ch 2 →
- Content delivery network (CDN)
- Servers placed near users so heavy content travels a short distance; Netflix's is Open Connect. Ch 13 →
- Correlation vs. causation
- Moving together vs. one driving the other; trust correlations with a mechanism and a large sample. Ch 6 →
- Curb-cut effect
- Features built for disability that end up serving everyone. Ch 11 →
- Custom / packaged / SaaS
- Built for you, bought off the shelf, or rented by subscription on the vendor's computers. Ch 11 →
- Cycle time
- Elapsed time from process start to finish, waiting included. Ch 4 →
D
- Dashboard / self-service BI
- Visual metric displays, and the tools (like Tableau) that let analysts build them directly. Ch 6 →
- Data
- Raw recorded facts; a transaction line. Ch 2 →
- Data
- A recorded representation of a fact, with a type. Ch 7 →
- Data gravity
- Compute and services accumulate around where the data already sits, which is why the first region choice lasts. Ch 13 →
- Data pipeline
- An automated route that moves data from where it is produced to where it is analyzed. Ch 4 →
- Data stewardship
- The duty of care owed by whoever holds data, especially about people who did not consent. Ch 10 →
- Data vs. information
- Data is captured facts; information is data given context so that it helps somebody decide. Ch 1 →
- Data warehouse
- A copy of operational data shaped for analytical questions. Ch 7 →
- Data warehouse
- A database organized for analysis, fed by copies of operational data. Ch 6 →
- Data-center externalities
- Energy, water, noise, and grid strain landing on neighbors of the buildout. Ch 13 →
- Demand-planning
- Forecasting what to make and stock; the module that failed at Nike. Ch 8 →
- Descriptive / diagnostic / predictive / prescriptive
- The four kinds of analytics: what happened, why, what will, what to do. Ch 6 →
- Direct cutover
- Moving all users to a new system at once, with no fallback. "Big bang." Ch 5 →
- Disclosure
- The obligation of public companies to report events, including system failures, that investors would consider significant. Ch 8 →
E
- Elasticity
- Capacity that grows and shrinks in minutes, so peak demand stops dictating year-round cost. Ch 13 →
- Enterprise system
- Software running core operations on one shared database across the whole firm. Ch 8 →
- ERP / CRM / SCM
- The resource-planning spine; the customer system; the supply chain system. Ch 8 →
- Externality
- A cost borne by people outside the decision; central to both security chapters. Ch 10 →
F
- Feedback loop
- A path by which process output re-enters as input, enabling correction. Ch 4 →
- Feedback loop
- Outputs that shape the future training data, letting a model confirm itself. Ch 12 →
- Fine-tuning / distillation
- Adapting a model to a task, and compressing a large one into a cheaper one that keeps what matters. Ch 12 →
- FinOps
- The discipline of managing cloud spend; elasticity's bill, owned by someone. Ch 13 →
- First-mover advantage
- The edge from acting before rivals; real, and routinely oversold. Ch 3 →
- Five components of MIS
- Hardware, software, data, networks, and people, this book’s analytical thread. Ch 1 →
- Flywheel
- A self-reinforcing loop where the output of each turn becomes the input to the next, so the advantage widens on its own as long as the loop keeps running. Ch 3 →
- Foreign key
- A field holding another table's primary key; how tables connect. Ch 7 →
- Framework
- A structured, auditable set of accepted practices (e.g., NIST CSF, COBIT). Ch 10 →
- Functional requirement
- A statement of behavior the system must perform. Ch 5 →
G
- Generative AI / LLM
- Models that produce new content; large language models are the text-generating kind. Ch 12 →
- Go-live / big bang
- The cutover moment; moving everyone at once, with no fallback. Ch 8 →
- Goodhart's law
- When a measure becomes a target, it ceases to be a good measure. Ch 6 →
- GRC
- Governance, risk, and compliance: the business side of managing security. Ch 9 →
- Grounding
- Tying generated output to verified data so the model narrates reality instead of inventing it. Ch 12 →
H
- Hallucination
- Fluent, confident output that is simply wrong; Lab 1's calculator test at scale. Ch 12 →
- Handoff
- A transfer of work across a boundary; the usual site of delay and lost information. Ch 4 →
- Human in the loop
- Keeping a person positioned to catch what an automated system cannot, before its output becomes an action. Ch 2 →
- Human-in-the-loop
- Deciding which model outputs require a person's judgment before they act on the world. Ch 12 →
I
- IaaS / PaaS / SaaS
- Renting raw machines, a managed platform, or the finished application. Ch 13 →
- Inference
- Using the trained model on new cases; where models earn their keep. Ch 12 →
- Information
- Data given context so that it helps somebody decide. Ch 2 →
- Information quality
- Accuracy, completeness, timeliness, consistency, relevance; failure on one dimension can zero the rest. Ch 2 →
- Information silo
- A department-level system holding its own copy of the truth; ERP exists to demolish them. Ch 8 →
- Information system
- Hardware, software, data, networks, and people, working together to collect data and deliver it to a user in a meaningful form. Ch 1 →
- Integration testing
- Checking that two or more parts work correctly together, including systems owned by other organizations. The level that would have caught the Mars Climate Orbiter. Ch 5 →
- Iron triangle
- Scope, schedule, and quality. Fix any two of them and the third moves on its own. Ch 5 →
- IT governance
- The structures and decision rights that determine who directs, does, checks, and answers for technology. Ch 10 →
J
- Join
- Answering a question across tables by matching keys. Ch 7 →
K
- Kill chain
- The ordered stages of an intrusion; defenders need to break only one. Ch 9 →
- Knowledge
- Information joined with the experience to act on it well. Ch 2 →
L
- Large language model (LLM)
- The kind of AI behind ChatGPT: a program trained on enormous amounts of text that can produce fluent sentences on request. Nobody writes its rules; it learns them from examples, which is why its behavior comes from its training data. Ch 1 →
- Lateral movement
- An attacker spreading from a foothold deeper into a network. Ch 9 →
- Least privilege
- Every account gets the minimum access its job requires. Ch 9 →
M
- Machine learning
- Learning patterns from examples instead of following hand-written rules. Ch 12 →
- Managerial decision
- Runs the quarter; cyclical, made from summaries. Ch 2 →
- Market inefficiency
- A gap between price and value, here created by an industry-wide measurement error. Ch 6 →
- Master data
- The reference facts (products, prices, customers, locations) every module depends on. Garbage here propagates everywhere. Ch 8 →
- Measurement validity
- Whether a metric actually measures what it claims to. Ch 6 →
- Metric / KPI
- A number chosen to stand for something the business cares about; a key performance indicator is a metric elevated to a target. Ch 6 →
- Minimum viable product
- The smallest version that delivers real value to a real user, released in order to learn from what happens. Ch 5 →
- MIS
- The business management of technology: deciding what an information system should do, who does the work, whether it is working, keeping it working over time, and answering for the result. Ch 1 →
- MoSCoW
- Sorting requirements into must have, should have, could have, and won't have this time. Ch 5 →
- Multi-factor authentication
- Requiring more than a password, so a stolen one is not enough. Ch 9 →
N
- Network effects
- A system that grows more valuable to each user as more users join. Ch 3 →
- Network segmentation
- Fencing systems into zones to contain a compromise. Ch 9 →
- Non-functional requirement
- A required quality: speed, capacity, availability, security. Ch 5 →
- Normalization
- Designing tables so every fact is stored exactly once. Ch 7 →
O
- OLTP
- Systems that record events as they happen; many tiny writes. Ch 7 →
- Omnichannel
- Many customer-facing surfaces reaching one underlying process and one record of the order. Ch 4 →
- On-base percentage
- Share of plate appearances reaching base; the undervalued, more valid measure. Ch 6 →
- Operational decision
- Runs the day; frequent, rule-following, often automated. Ch 2 →
- Operational transparency
- Deliberately exposing internal process stages to the customer. Ch 4 →
P
- Prompt injection
- Tricking an AI that is connected to company records into handing over information it should not, using an instruction hidden in an ordinary-looking input. Ch 2 →
- Patch management
- The process ensuring known fixes actually reach every affected system. Ch 10 →
- Pilot conversion
- Deploying to a limited group first to surface defects at low exposure. Ch 5 →
- Post-implementation review
- Asking, months after launch, whether the system delivered what was promised and what to do differently next time. Ch 5 →
- Primary key
- The field that uniquely identifies each record in a table. Ch 7 →
- Process fit
- The degree to which the software's embedded processes match the organization's real ones. Ch 8 →
- Process instrumentation
- Capturing timestamped events at each step so the process becomes measurable. Ch 4 →
- Proprietary data
- Data your own operation produces that no vendor sells and no rival can buy, including the years of history behind it. Ch 3 →
- Proxy
- What every metric secretly is: a stand-in for the real thing, valid only as far as it tracks it. Ch 6 →
- Proxy discrimination
- The model rediscovering a removed attribute through its correlates. Ch 12 →
- Public accommodation nexus
- The Ninth Circuit's rule: the ADA reaches a site or app that connects customers to a physical business's goods and services. Ch 11 →
Q
- Quantitative / qualitative
- Numeric data you can do math on; descriptive data you group by. Ch 7 →
R
- Ransomware
- Malware that encrypts data and demands payment; modern versions also steal it (double extortion). Ch 9 →
- Record / field
- One complete fact-bundle; one attribute within it. Ch 7 →
- Region / availability zone
- The geographic units clouds are sold in; where your workload lives, fails, and is billed. Ch 13 →
- Requirements / RFP
- What the software must do, written down before any vendor demo can write it for you. Ch 11 →
- Requirements elicitation
- The work of finding out what a system must do, through interviews, observation, document analysis, workshops, and prototypes. Each method has a different blind spot. Ch 5 →
- Responsibility
- The obligation to do the work. Ch 10 →
- RFID
- Radio tags that let a reader identify many items at once without line of sight; the basis of Zara's live inventory picture. Ch 3 →
- Risk-tier regulation
- The EU AI Act's architecture: obligations scale with the stakes of the use, from banned to barely regulated. Ch 12 →
- Robotic process automation (RPA)
- Software performs rule-following clerical steps itself. Ch 4 →
S
- Sabermetrics
- The empirical analysis of baseball; the movement that found the industry's measurement error. Ch 6 →
- Screen reader
- Assistive software that speaks an interface aloud, if the interface was built with the structure it needs. Ch 11 →
- Scripted demo
- Vendors performing your tasks on your data, not their rehearsed path. Ch 11 →
- SDLC
- The phased sequence from planning through maintenance that structures system development. Ch 5 →
- Semi-structured decision
- Part procedure, part judgment. Most real decisions, and the reason most systems support a person rather than replace one. Ch 2 →
- Single-instance
- One global system of record instead of regional copies; Nike's strategic bet, kept even after the failure. Ch 8 →
- Small batches
- Committing to a little at a time and reordering against what actually sold, rather than betting a season on a forecast. Ch 3 →
- Small-sample problem
- Patterns in little data mislead; a five-game series is a coin flip. Ch 6 →
- Speed of learning
- Running the signal-to-shelf loop faster than rivals, so you test more ideas in the same time and the advantage compounds. Ch 3 →
- Stage gate
- A scheduled review with authority to halt a project before the next phase. Ch 5 →
- Strategic decision
- Sets direction; rare, hard to reverse, judgment-heavy. Ch 2 →
- Structured data
- Facts in a fixed grid of typed fields; what databases were built for. Ch 7 →
- Structured decision
- Has a known procedure a system can execute. Ch 2 →
- Supervised / unsupervised
- Learning from labeled outcomes vs. finding structure with no labels. Ch 12 →
- Sustainable competitive advantage
- An edge that persists because its source is valuable, rare, and hard to imitate. Often written "sustained"; the two mean the same thing here. Ch 3 →
- Swimlane diagram
- A process map with one lane per actor; handoffs appear as arrows crossing lanes. Ch 4 →
- Switching costs
- What a customer gives up by leaving: history, data, learned habits. Ch 3 →
- System vs. application software
- What runs the machine vs. what does the business's work. Ch 11 →
- Systems analysis
- Determining what a system must do, and in what order to build it, before construction begins. Ch 5 →
- Systems integrator
- The party accountable for making independently built components work as one system. Ch 5 →
- Systems thinking
- Seeing the whole system rather than its parts in isolation. Ch 1 →
T
- Technical debt
- Future cost incurred by shipping a shortcut now. Ch 5 →
- The value test
- Information is worth collecting when it helps somebody decide, including by confirming a decision, and the improvement is worth what the information costs to produce. Ch 2 →
- Third-party (vendor) risk
- The security exposure created by the outside companies you rely on. Ch 9 →
- Throughput
- Completed units per unit of time. Ch 4 →
- Too much information
- When the useful piece exists but is buried in so much else that nobody finds it in time. Ch 2 →
- Total cost of ownership
- License plus implementation, integration, training, support, and the cost of leaving. Ch 11 →
- Training data / label
- The historical examples a model learns from, and the outcome attached to each. Ch 12 →
- Training-data bias
- A skew in the examples, faithfully learned and reproduced. Ch 12 →
- Translation
- Standing between the technical side of a system and the human side: saying what an output means for a particular decision, and knowing when not to trust it. Ch 1 →
U
- Unstructured data
- Text, images, audio: no fixed grid; most of the world's data. Ch 7 →
- Unstructured decision
- No formula; information supports but judgment decides. Ch 2 →
- Update / insertion / deletion anomaly
- The three ways a single big grid corrupts itself. Ch 7 →
- Usability
- Measurable properties of an interface: learnability, efficiency, error tolerance. Ch 11 →
- User acceptance testing
- Real users doing real tasks, deciding whether a system is fit to release. Ch 5 →
- User story
- A requirement written as: as a kind of person, I want to do something, so that I get some result. The third clause is the one people drop. Ch 5 →
V
- Vendor lock-in / egress fees
- Switching costs implemented in infrastructure: free to arrive, priced to leave. Ch 13 →
- Vulnerability
- A known weakness attackers can exploit; the Struts flaw was one. Ch 10 →
W
- Waterfall
- One pass through the phases with document sign-offs; predictable, and all learning arrives at the end. Ch 5 →
- WCAG
- The Web Content Accessibility Guidelines: perceivable, operable, understandable, robust; the working legal standard. Ch 11 →
- Weakest component rule
- System value is capped by the weakest of the five components, not the strongest. Ch 1 →
- Wisdom
- Knowing what to do with knowledge, and whether to act at all. Ch 2 →
- Workflow automation
- Software routes and tracks the work; humans perform the steps. Ch 4 →
180 terms across thirteen chapters. Where two chapters define the same term differently, both entries appear; the difference is usually the point.